Dallas new-build due diligence · October 13, 2026
Treat the inspection as a documented handoff.
Match the inspection to the home’s construction stage, route findings through the signed contract and verify the builder’s response before a closing decision.

Quick answer
A municipal or builder inspection and a buyer’s real-estate inspection do not necessarily have the same client, scope or report. Start with the signed contract: confirm access, notice, inspection rights, builder-response procedure and decision dates before scheduling work.
Use a Texas-licensed inspector for a buyer inspection, read the written scope and preserve findings, responses and any reinspection as separate records. An inspection report does not guarantee future performance or decide what the builder must repair.
Private inspection board
Separate findings, responses and verification.
0 of 5 reviewed
Mark the work you have completed. Nothing is stored or sent, and the board does not decide whether construction is compliant, complete or acceptable.
1. Identify the contract and construction stage
TREC publishes separate new-home forms for incomplete and completed construction. Its current completed-construction page identifies Form 24-20, effective July 1, 2026, for a completed home that no one has previously occupied. Confirm which signed agreement and builder addenda govern your purchase; do not substitute a generic checklist for its access or deadline terms. TREC completed-construction contract page
2. Match the inspection to what is accessible
TREC says its inspector Standards of Practice are minimum requirements for an inspection of a substantially completed one-to-four-family unit. The rules define substantially completed as the stage when the building can be occupied or used for its intended purpose. A pre-drywall or other phase review may use a different scope, so ask the inspector exactly what standard and report format will apply. TREC inspector Standards of Practice
Record which structure, roof, electrical, plumbing, HVAC, grading, drainage, appliances and interior components were accessible, excluded or limited. Route specialist questions rather than treating a general inspection as an engineering, code, environmental or warranty determination.
3. Build a location-specific findings list
For every reported item, preserve the exact room or exterior location, photo, component, inspector classification and requested builder response. Keep cosmetic walkthrough notes distinct from inspector findings and from municipal or builder quality-control records.
TREC explains that the inspection report helps the client in purchasing the home and that the inspector’s responsibility is to the client. That does not make the report a builder repair order. Your executed contract controls rights and remedies. TREC consumer guidance for employing an inspector
4. Track the builder response without declaring victory early
Use separate statuses: received, builder reviewing, proposed correction, completed, reinspected, unresolved and buyer decision. Ask for a written response tied to each item. A promised repair, closed ticket or clean municipal record does not by itself verify the observed condition.
When the schedule permits, arrange a reinspection or other qualified follow-up for material work. The Dallas option-period guide can help organize decision work when that negotiated period applies; new-home contracts may use different provisions.
5. Reconcile the final walkthrough and closing file
At the final walkthrough, compare the property with the written findings and builder responses. Preserve unresolved items, warranties, manuals, permit or approval records supplied, inspection reports and closing documents together. Do not assume a warranty will cover a known condition; read the actual warranty and claim procedure.
Use the title-commitment guide for the separate title lane and the cash-to-close guide for funds. Neither replaces construction, inspection or legal review.
Buyer next step
Give every finding an owner, response and verification status.
Keep the inspection scope, report, builder response and reinspection separate so an open item cannot disappear inside a general punch list.